Exterior House Painting in Oahu & Maui
Sun, salt air, and rain are hard on Hawaii exteriors. We prep for those conditions specifically — wash, repair, prime, and coat with systems matched to your surface and your elevation. Licensed Hawaii contractor BC-28938.
Paint Doesn't Fail. Preparation Does.
Almost every peeling, blistering, or chalking exterior we're called to inspect has the same story behind it: the surface wasn't clean, wasn't dry, or wasn't primed before someone rolled paint over it. In Hawaii that shortcut shows up fast — sometimes within a single year.
We treat prep as the actual job. The paint is just what goes on top of it.
Every Surface Gets a Different Approach
Stucco
Wood Siding & Trim
Concrete & CMU
Metal Railings & Doors
Soffits, Fascia & Eaves
The Exterior Scope, Start to Finish
- —Pressure washing and mildewcide treatment across all painted surfaces
- —Scraping, sanding, and feathering failed coating edges
- —Crack, hole, and rot repair before any primer goes on
- —Re-caulking joints, trim, and penetrations
- —Spot or full priming based on surface condition
- —Two finish coats unless the estimate specifies otherwise
- —Masking and protection for landscaping, walkways, and fixtures
- —Daily cleanup and a final walkthrough with you
How an Exterior Project Runs
On-Site Walkthrough
We inspect each elevation, note surface condition, and photograph problem areas.
Written Estimate
Scope, prep sequence, named products, and timeline — in writing before you commit.
Wash & Repair
Pressure wash, treat mildew, then repair cracks, rot, and failed caulking.
Prime & Paint
Primer where needed, then finish coats applied elevation by elevation.
Final Walkthrough
We walk the property with you, handle touch-ups, and clean the site.
Recent Exterior Projects
Full Exterior Paint
Honolulu, Oahu
Whole House Repaint
Waipahu, Oahu
Property Exterior Repaint
North Shore, OahuRequest a Free Exterior Painting Estimate

Contact Information
Request a Free Quote
Tell us about your project and preferred contact method.
Frequently Asked Questions
Exposure matters more than age. Coastal and full-sun elevations weather fastest; shaded and leeward walls last longer. Most Hawaii exteriors need attention every five to eight years, and a walkthrough tells you which elevations are due now and which can wait.
Most single-family homes run three to five working days, and larger or two-story homes five to eight, depending on size, prep needs, and weather. Your written estimate includes a projected schedule.
Nearly always. Washing removes dirt, chalking, salt, and mildew so the coating can bond. Pressure is matched to the substrate, and surfaces have to dry fully before priming.
Exterior work pauses and resumes when surfaces are dry. We track the forecast and sequence elevations around weather windows rather than risk a failed coat.
Yes. Cracks, holes, failed caulking, and rot are addressed before priming. Larger repairs are quoted separately so the cost is visible, not buried.
Plants, walkways, fixtures, and outdoor furniture near the work area are masked and covered before prep begins, and the site is cleaned at the end of each day.
